INSTALLATION PROCEDURE
Caulking
4. Apply silicone caulk to water-
proof the clearance between the
plaster guard and the floor, and
lower the plaster guard down to
the finished floor surface.
Mounting the hand shower
and hose
5. Make sure that the gasket
is mounted adequately, then
mount the shower hose and the
hand shower. This completes
product installation.
Testing the water supply connec-tions.
6.Turn on the water supply and confirm that water comes out from the
spout and shower. Check around the hose connections and clearances for
any water leakage.
5