Descargar Imprimir esta página

Toto Connelly TB221DD Manual De Instrucciones Y Del Propietario página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION PROCEDURE - SPOUT
1.
Confirm that the valves have been installed properly. See
the TBMT2 installation manual for further information.
2.
Remove plug from outlet. (Figure 1).
3.
Orient spout assembly as shown and lower onto exposed
portion of diverter valve. Fasten spout to valve with
provided set screw. Tighten with hex key as needed.
(Figure 2).
Remove plug
Figure 1
INSTALLATION PROCEDURE - HANDLES
1.
Orient handle assembly and lower
onto the exposed portion of valve
until engaged. Fasten spout to
valve with provided set screw.
Tighten with hex key as needed..
2.
Repeat for other handle assembly.
NOTE: If handles do not line up
exactly as desired, remove handle
from valve and reinstall one (1)
notch over (on valve).
Fine adjustment may be done
by slightly rotating valve from
underneath installed surface.
Spout Assembly
Figure 2
4
Set Screw
Handle Assembly
Hot
Cold

Publicidad

loading