Fax +32 2 359 95 50
•
The resulting extended cord should be arranged so that it will
not drape over the counter top or tabletop where it can be
pulled on by children or tripped over.
PART DESCRIPTION
Lid
Spout
Body
Water gauge
BEFORE THE FIRST OPERATION
For a perfect taste, operate the jug kettle with fresh water in order to
clean any residue left from the manufacturing process. When the
appliance has cooled down, repeat the process 3 times with fresh
water, before rinsing.
Copies of the I/B. Please reproduce them without any
changes
except
under
International BELGIUM. The pages must be reproduced and
folded in order to obtain a booklet A5 (+/- 148.5 mm width x
210 mm height). When folding, make sure you keep the good
numbering when you turn the pages of the I/B. Don't change
the page numbering. Keep the language integrity.
4
Assembly page 4/24
special
instruction
from
Open lid button
Handle
Switch
Power base
USK JK 23431- 091125
Team