Descargar Imprimir esta página

IPC PW-C85 Manual De Instrucciones página 25

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
CHANGING THE HIGH PRESSURE NOZZLE
Information
The high pressure nozzle fitted on the lance must be changed
from time to time, as this component is subject to normal wear
during use. Wear may generally be detected by a drop in the
working pressure of the cleaner. To replace it, consult your
supplier and/or dealer for instructions.
TABLE OF ROUTINE MAINTENANCE TO BE PER-
FORMED BY THE USER.
Description of operations:
Check power cable - pipes - high pressure
connectors
Ist oil change in H.P. pump
Subsequent changes in H.P. pump
Clean water filter
These intervals refer to normal working conditions. For heavy duty use decrease the interval for each job.
For maintenance and/or repairs, use only original spare parts which offer the greatest characteristics of quality and
reliability. Failure to use original spare parts absolves the manufacturer from all liability and transfers it to the per-
If the machine is to remain inactive for a long period, disconnect the supply sources, drain the tank(s) of all the operating fluids
and protect any parts that could be damaged by the accumulation of dust.
Grease the parts that could be damaged by drying out, such as the supply hoses. When bringing back into use, ensure that
there are no cracks or cuts in the water supply hoses.
Oil and chemical products must be disposed of according to current legislation.
If you no longer wish to use the water cleaner, you should render it unusable by removing the power cable.
You should also make sure that all potentially hazardous parts of the appliance are made safe, particularly for children who could
play with the unused water cleaner.
This product is classified as WEEE type special waste and is covered by the requisites of the new environmental protection
regulations. It must be disposed of separately from ordinary waste in compliance with current legislation and standards.
Do not use parts dismantled for scrap as spare parts.
English
TABLE OF EXTRAORDINARY MAINTENANCE TO
BE PERFORMED BY THE TECHNICAL SERVICE
CENTRE.
Description of operations:
Each use
Change seals on H.P. pump
Change lanze nozzle
Calibrate and check the safety devices
After 50 hours
Every 500 hours
Every 50 hours
IMPORTANT:
son carrying out the operation.
PERIODS OF INACTIVITY
SCRAPPING
- 25 -
Every 500 hours
Every 200 hours
Once a year

Publicidad

loading