Descargar Imprimir esta página

Westinghouse S09SZA1 Instrucciones De Uso E Instalación página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation instructions
Wire connection steps:
24K/36K
(1)
Electric box cover removal
Unscrew the mounting screws to remove the electric box cover.
(2) Fasten the power supply cable and the transmission cable to the conduit holder using the lock nut.
(3) Connect the power supply cable and the transmission cable to terminal.
(4) Fasten the power supply cable and the transmission cable with the cable clamp.
(5) Seal holes and gaps using putty.
Place the cables side by side. (Do not overlap the cables.)
(6) Re-install the electric box cover back after completion of the work.
48K/60K
(1) Remove the screws, maintenance plate, and the valve cover.
(2) Pass transmitting cable and power supply through the two holes on the right side plate.
(3) Fasten the conduit connection to the right side plate using the lock nut.
(4) Connect the transmission cable and power supply to the terminal.
(5) Tie the transmission cable and power supply with the clamp tightly.
(6) After completing the wiring, seal holes and gaps using putty.
(7) Re-install the maintenance plate and the valve cover after completion of the work.
Maintenance plate
Lock nut
(field-supplied)
Conduit plate
Conduit connector
(field-supplied)
Right side plate
Lock nut
Hole
Conduit connector
Valve cover
Right side plate
Transmitting cable
Power supply
Lock nut(Qty:2)
Conduit connector for
transmitting cable
Conduit connector for power supply
10
Power supply
Transmitting cable
(to wired controller)
Valve cover
Maintenance
plate

Publicidad

loading

Este manual también es adecuado para:

S12sza