Descargar Imprimir esta página

Free2Move eSolutions eProfessional Manual De Instalación página 275

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 132
2.6.
Wall mounting
The national and international building regulations set out in IEC 60364-1 and
IEC 60364-5-52 must be respected when fixing eProfessional to the wall. Correct
positioning of the charging station is important to ensure it functions properly.
To fix the main body to the wall, 3 plugs (Ø 10x50 mm) are required.
The plugs supplied are universal, and are suitable for solid or hollow brick walls. For installation
on walls made of different materials (e.g. plasterboard), specific plugs are required, and must
only be installed once the maximum permissible load has been verified.
1.
Before installation, it is necessary to determine the position and distances from walls.
We recommend maintaining a distance of about 50-60 cm from the walls to facilitate
installation and maintenance.
2.
To facilitate installation and wall mounting, use the template supplied to drill the 3
fixing holes. The template should also be used for levelling with a spirit level.
3.
Using a drill, make 3x Ø10 mm holes where the fixing points are marked. The minimum
depth of the hole must be 60 mm. Then remove any drilling residue from the holes.
4.
Push the fixing plugs into the holes with a hammer
5.
Secure the main body to the wall by inserting the screws through the holes.
17

Publicidad

loading