Descargar Imprimir esta página

Chicago Pneumatic CP 0122 SVR Instrucciones De Seguridad Y De Funcionamiento página 17

Ocultar thumbs Ver también para CP 0122 SVR:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 62
CP 0122 SVR, CP 0125 SVR
For the machine to maintain the specified
vibration values, always check the following:
Too large a clearance between the insertion tool s
shank and the chisel bushing will generate
increased vibrations. To avoid getting exposed to
excessive vibrations, check the chisel bushing for
wear every day.
If the machine has a vibration-absorbing
handle/handles, check that it moves freely (up
and down) and does not jam.
Change damaged parts immediately.
Replace worn components in good time.
Make sure that all the attached and related
equipment, such as hoses, water separators and
oilers are properly maintained.
Periodic maintenance
After each operating period of approximately 100
impact hours or three times a year the machine must
be dismantled and all parts be cleaned and checked.
This work must be performed by authorized staff,
trained for this task.
9800 0834 90b | Original instructions
www.CrowderSupply.com • Toll Free: 888-883-5144
Safety and operating instructions
Assembly instructions
A.
Torque: 11-12 lbf/ft (15-17 Nm), UNF ¼"x44
(1-¾")
Torque: 11-12 lbf/ft (15-17 Nm), UNC ¼"x32
B.
(1- ¼")
Torque: 45-50 lbf/ft (61-68 Nm). Use Loctite®
C.
243™. (Loctite is a registered trademark of
Henkel Corporation. 243 is a trademark of
Henkel Corporation.)
D.
Torque: 12 lbf/ft (17 Nm). Use Loctite® 243™.
E.
Remove the O-ring from the seal before
assembly. The O-ring is only a support to
ensure that the seal retains the correct shape
until it is fitted.
Do not lubricate support rollers, wear ring, or
F.
corresponding contact surfaces.
Torque: 400 lbf/ft (540 Nm).
G.
17

Publicidad

loading

Este manual también es adecuado para:

Cp 0125 svr