Operating The Machine
Expected Run Time
The expected run time for this machine depends upon
which mode the machine is in. This duty cycle includes
an amount of time that the machine will be running
along with a period of time that the machine should be
off to empty the Recovery Tank, fill the Solution Tank
and check the Brush.
Typical Run Time for each Mode:
Deep Extract 15 minutes ON
10 minutes OFF
Eco Mode
20 minutes ON
10 minutes OFF
Interim Mode 60 minutes ON
10 minutes OFF
STEP 1
STEP 2
8.645-280.0 Manual Operator Flotilla BRC 45-38
1. Select a mode from the Main Control Membrane
Switch for the desired results.
See Main Control Membrane Modes page for
detailed description of each function.
2. Turn on Solution Switch.
•
Press the bottom of the switch to turn solution
on.
•
Press the top of the switch to turn solution off.
Operations
27