Descargar Imprimir esta página

Daikin Altherma FWXV10ABTV3 Manual De Instalación página 12

Convector para bomba de calor

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
INSTALLATION
Mounting the condensation discharge pipe in the horizontal version
To mount the horizontal bowl on the FWXM-series refer to
the instructions in kits EKM(10/15/20)COH.
-
check that the "L" pipe and the flexible rubber hose
are correctly connected to the bowl.
-
slide in the side of the machine keeping the pipe in
position up against the front grill.
-
fully close the side checking that the pipe remains
blocked in the special grove on the side.
A
Connection pipes - Ø14 mm
2.10
Filling the system
When starting up the system, make sure that the hydraulic
unit lockshield is open. If there is no electric power and the
2.11
Evacuating air while filling the system
-
Open all the shut off valves (manual or automatic);
-
Start the filling by slowly opening the system water
filling tap;
-
For the unit installed in a vertical position, take a
screwdriver and open the highest breather of the heat
exchanger; for appliances installed in a horizontal
position, open the highest positioned breather.
A
Breather
12
N.B. for the horizontal installation carefully note the
following precautions:
-
make sure that the machine is installed perfectly level
or with a slight inclination towards the condensation
discharge;
-
insulate carefully the inflow and outflow pipes up to the
machine union to prevent any drops of condensation
outside the same collection bowl;
-
insulate the bowl condensation discharge pipe along
all of its length.
B
Discharge
B
A
thermo-valve has already been powered use the special
cap to press the valve stopper to open it.
-
When water starts coming out of the breather valves
of the appliance, close them and continue filling until
reaching the nominal value for the system.
Check the hydraulic seal of the gaskets.
It is advisable to repeat these operations after the appliance
has been running for a few hours and periodically check
the pressure of the system.
A
A
U
I
S

Publicidad

loading