Everbilt LTS250A Instrucciones De Uso página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Installation (continued)
SPECIFICATIONS
Power supply
Liquid temp. range
Pump Inlet
Pump discharge
Installation
(SEE FIGURES 1 AND 2)
WARNING: Electric Shock Hazard. Plug pump into a properly grounded, GFCI protected outlet. Do NOT plug in the pump until after it is
completely installed. Do not remove or modify the grounding pins on the plugs.
115V, 60 HZ., 15 Amp Circuit
32°F to 120°F (0°- 50°C)
1-1/2 in. NPT
1-1/4 in. NPT
Figure 1: Typical method of mounting the pump
Fittings Supplied:
A Sink Drain Screen
B 1-1/4" NPT x 1-1/4" Slip Check Valve
C 1-1/4" NPT Ball Valve
Purchase Separately:
1 1-1/2" NPT x 1-1/2" Slip Female Adapter
2 1-1/2" Schedule 40 PVC Pipe, to fit
3 1-1/2" NPT x 1-1/2" Slip Male Adapter
4 1-1/4" NPT Galvanized Nipple (to fit)
5 1-1/4" NPT Galvanized Union
6 1-1/4" NPT x 1-1/4" Male Adapter
7 1-1/4" Schedule 40 PVC Pipe, to fit
8 1-1/4" Socket to Socket 90° Elbow
9 1-1/4" Schedule 40 PVC Pipe to Drain
PVC Pipe Cement
PTFE pipe thread sealant tape
1-1/2" PVC Solvent Union – optional
NOTE: Be careful to avoid cross-threading; Use only a
plastic-compatible pipe-threading compound or teflon tape
when connecting threaded fittings to plastic adapters.
5
For Professional Technical Support call 1-844-241-5521
Qty.
1
1
1
Qty.
1
1
1
1
1
1
1
1
As Needed
As Needed
As Needed
As Needed

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido