Descargar Imprimir esta página

Glacier bay HD874X-0010H Guía De Uso Y Mantenimiento página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Preparing for installation
CAUTION: Always shut off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
Shut off the water supply to the tub and
shower.
Verify that the hole sizes and positions of the
holes in the wall are correct:
The shower and tub spout outlet holes
should be 1-1/4 in. diameter.
Refer to Step 2 for valve access hole
dimensions.
The recommended valve depth to the
nished wall is 1-1/2 in. min. to
2-1/2 in. max.
Ensure that the valve body (D) cover is ush
with the nished exterior surface of the wall.
Position the valve body (D) correctly in the
wall with the side marked "UP" pointing up.
The 8 in. minimum from the valve body (D) to
the tub spout (J) is required for proper operation.
30 in.
Shower Only
48 in.
Shower Only
1 1/4 in. Diamter
1 1/4 in. Diameter
48 in.
Tub & Shower
Refer to
the step 2
D
8 in. Min.
30 in.
Tub & Shower
2
Installing the valve body
A. Thin Wall Installation
"Thin Walls" are usually built with materials such
as berglass which will not support the valve.
Please keep the plaster guard (L) attached to the
valve as it will be your main source of support.
B. Thick Wall Installation
"Thick Walls" are usually built up with materials
such as cement board, drywall, tile, etc. The plaster
guard (L) is positioned so that it is ush with the
nished wall. This ensures that the valve will be at
the correct position to accept the trim. The depth
for the valve body (D) in wall is measured from the
center of the shower outlet to the nished wall
surface. The accepted depth distance is 1-1/2 in.
to 2-1/2 in.. When the depth distance is 1-1/2 in.
to 2-1/4 in., there will be interference between the
plaster guard (L) and escutcheon (E). It is
recommended that you remove the plaster guard (L)
after the wall installation.
NOTE: Be sure to position the valve body (D) correctly in
the wall, with the side marked "UP" facing upward.
1-1/2 in. to 2-1/2 in.
Finished wall
7
Please contact 1-855-HD-GLACIER for further assistance.
Finished wall
D
L
HOMEDEPOT.COM/GLACIERBAY
D
L

Publicidad

loading

Este manual también es adecuado para:

Hd874x-000110028319091009352495