Descargar Imprimir esta página

enphase EVSE Manual Del Usuario página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

Mobile EV Charger EVSE User Manual
For Hollow-Wall Construction Mount:
• Place the EVSE so both mounting tabs can take advantage
of solid structural framing inside of the wall or a strong wall
surface. See Hollow-Wall Construction in Figure 2A.
• Use proper anchoring hardware such as drywall toggles or
molly bolts if unable to mount hardware into a solid surface.
See Hollow-Wall Construction in Figure 2B.
Figure 2: Mobile EV Charger Mounting Options
For Solid-Wall Construction Mount:
• To secure the unit in concrete, pre-drill appropriately sized holes
and use multi-set or wedge anchor hardware at both mounting
points.
• To secure the unit in brick or stone, pre-drill appropriately sized
holes and use sleeve anchors at both mounting points.
Figure 2A
Page 14
Figure 2B

Publicidad

loading