Descargar Imprimir esta página

BYD HVS 5.1 Guia De Inicio Rapido página 98

Ocultar thumbs Ver también para HVS 5.1:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
Cable Length 20 m
1
Cable Length 20 m
94
1.Parallel connection is not applicable to
SMA Sunny Boy Storage 3.7-6.0. Please
check the inverter's operating manual on
how to connect up to three battery systems.
2.The length of the power cables to the
combiner box should be the same.
3.If the BYD combiner box is not used, the
parallel connection device should meet the
following requirements. (Except for
GoodWe ET 15-30kW when it is connected
with the battery systems)
a) No less than IP55 for the outdoor use.
b) Maximum operating voltage:1000V DC.
c) Maximum output current: 40A DC.
d) Breaking current: 40A DC.
4.The total power cable length between each
battery tower and the inverter should be
less than 20 meters.
1.Parallel connection is not applicable to
SMA Sunny Boy Storage 3.7-6.0. Please
check the inverter's operating manual on
how to connect up to three battery system.
2.The length of the power cables to the
combiner box should be same.
3.If the BYD combiner box is not used, the
parallel connection device should meet the
following requirements. (Except for
GoodWe ET 15-30kW when it is connected with
the battery systems)
a) No less than IP55 for the outdoor use.
b) Maximum operating voltage: 1000V DC.
c) Maximum output current: 40A DC
d) Breaking current: 40A DC.
4.The total power cable length between each
battery tower and the inverter should be
less than 20 meters.

Publicidad

loading