OPERATION INSTRUCTIONS
1. Flushing and checking for leaks:
Important: After installation is completed. Remove
the aerator on the faucet (A). Turn on the water supply
and allow both hot and cold water to run for at least one
minute each. While the water is running, check for leaks.
Turn off the water and replace the aerator. Do not lose
the gasket (1) in the aerator.
2. If it is necessary to remove the quick connector (1),
squeeze the tabs (2) on the quick connector and
then pull down to disconnect.
1
2
Squeeze
1
5
A
1
2
Pull
down
1