IMPORTANT
Please read
these
instructions carefully before you start to assemble this product.
Keep these
instructions
in
a
safe
place
for future
reference.
»
Customer Service
For
assistance
with
assembly,
replacement parts or any other additional information
please log
onto our website
or call our customer service line
(number
is
on
the
title
page).
www.palramapplications.com
»
Safety advice
It
is
of utmost importance
to assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves
during
assembly.
Always wear shoes and safety goggles when
working with extruded aluminium.
If using
a
step ladder or
power tools
ensure
that
you
follow
the manufacturers safety
advice.
Do
not touch overhead power
cables
with
the aluminium profiles.
Do
not attempt to
assemble the
product
in
windy
or
wet conditions.
Dispose
of
all
plastic
bags safely keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the
product during construction.
Do
not position your product
in
an area
exposed to
excessive
wind.
Do
not attempt to
assemble this
product if
you
are
tired,
have
taken drugs or alcohol
or
if
you
are
prone to dizzy
spell.
From safety reasons always
use
the
lockers
for
each
position
(close,
open,
ventilation,
storage)
as
shown
in
step
33
Hot items such
as
recently
used grills,
blowtorches
etc.
must not
be
stored
in
the product.
Ensure
there
are no
hidden pipes or
cables
in
the ground before inserting the
pegs.
This
product
was
designed to
be used
mainly
as
a
growhouse.
»
Care &
Maintenance
When your
product
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold
clean water. DO NOT use acetone, abrasive cleaners or
other
special
detergents to
clean
the
clear panels.
»
Tools
&
Equipment
Tape measure
Work gloves
Lubricant
Phillips head screwdriver
Step
ladder
Drill
bit
Large
hammer
Spanner
T001
-
Special
tool for
Screws
411
and nuts 412
it3
A
Silicon spray
»
Before
Assembly
This
is a
multi-part
assembly best achieved by
two
people.
Allow
at least
half
a
day
for assembly
process.
Selecting
a
site
-
the product must
be
assembled,
positioned
and fixed
on
a
flat
level surface.
Choose
a
sunny position away from overhanging
trees.
Take
out
all
components parts of the
packages. Sort
the parts and
check against the contents parts list.
During assembly parts should
be
laid
out
close at hand. Keep all small
parts
(screws etc.)
in
a
bowl
so
they do not get
lost.
»
Notice
Step
5
:
If trays are
dropping down when filled with
soil, push trays'
frame up
and
tight
these screws again on
their original position.
Step 26+27
:
make sure profiles are inserted all
the way till the end into plastic
connector.
Steps 29
:
If
lid does
not located correctly
on
the frame it will not closed and
opened properly.
Try
re-checking Step
22 (measure) and
Step 26+27 (insert profiles
all
the
way).
For easy
inserting of profile
960 use
lubricant
material or move lid up and
down.
Do
not
use
hammer.
Tighten
all screws
when completing
assembly.
»
After assembly
This
product's ground fixing
is
based on soil
weight.
When trays are
empty
it
should
be
kept from winds.
There
for
we
are
strongly recommending fixing the
product directly to
a
solid concrete
foundation.
Screws
411
and nuts 412 are used
thruoghout
the assembly
process.
Screws
411
are
to
be
assembled
from the outside
and nuts 412
from the inside
of
the greenhouse.
Do
not
fasten screws and nuts
(411
&
412) more than 2-3
turns only.
Do
not
tighten them until completion of the panels'assembly, if not specified otherwise.
However,
in
some steps,
temporary tightening of
a
few
screws may be
needed to
prevent
a
profile from falling
till
it
will
be
fully
connected
in
the next
steps.
A
LIM)
019