3
DETERMINE MOUNTING LOCATION
FIGURE 1.
• Determine the distance from the finished wall to the center of the
floor water supply holes and mark a centerline.
Note: Check that floor is level in both directions.
• Drill a 2" (51mm) diameter hole for the Hot and Cold supplies.
• Slide MOUNTING FLANGE (1) downwards on the TUB FILLER
ASSEMBLY (2).
• Place MOUNTING FLANGE (1) over the floor supply hole.
Align and center the TUB FILLER ASSEMBLY (2).
FINISHED WALL LINE
FIGURE 1
BASE BOARD
(1) 2" (51mm)
DIA. HOLE
FIGURE 2
FIGURE 3
- 3 -
2
1
HOT
Level
2
1
4
M965140 REV. 2.2 (5/22)