Descargar Imprimir esta página

American Standard Cadet 2764.951 Serie Instrucciones De Instalación página 4

Relleno de baño de control solo aislado

Publicidad

Idiomas disponibles

Idiomas disponibles

4
INSTALL INSTALL TUB FILLER ASSEMBLY FILLER
INSTALL WATER SUPPLIES AND "T" ADAPTER
FIGURE 1:
• Make sure FLEXIBLE HOT and COLD WATER SUPPLIES
protrude through the 2" (51mm) diameter hole in the floor
enough to make the supply connections to the
"T" ADAPTER (4).
FIGURE 2:
• Hold the TUB FILLER ASSEMBLY (1) in place and install
the four MOUNTING SCREWS (2).
• Check aligment and level before fully tightening the
MOUNTING SCREWS (2). After tightening the
MOUNTING SCREWS (2) slide ESCUTCHEON (3)
down to floor.
FIGURE 3:
• Apply sealing tape to the threads of the"T" ADAPTER (4)
and the two SUPPLY ADAPTERS (5). Thread the two
SUPPLY ADAPTERS (5) onto the "T" ADAPTER (4) and
tighten fully.
• From below the floor, connect the HOT WATER SUPPLY
HOSE (6) (marked with red) to the Hot water supply
from the "T" (4) and the COLD WATER SUPPLY HOSE (7)
to Cold water supply from the "T" (4). Use an adjustable
wrench or 7/8" open end wrench to tighten connections.
Do not over tighten.
• Secure piping below floor to floor joist.
FIGURE 3
6
RED (HOT)
HOT
4
5
1/2"-14 NPT
(13mm)
HOT
SUPPLY
- 4 -
FIGURE 1
FINISHED FLOOR
HOT
HOT
SUB-FLOOR
FIGURE 2
2
HOT
7
5
1/2"-14 NPT
COLD
(13mm)
SUPPLY
PIPE SUPPORT
SEALING TAPE
1-1/4"
(32mm)
COLD
1
3
M965140 REV. 2.2 (5/22)

Publicidad

loading

Este manual también es adecuado para:

Cadet 2764.721 serieCadet 2764.955 serieCadet 2764951.002