Mazda_CX5
2.0
Fuse
Fuse
5A
15A
Relé
LPG EV
WARNING:
- Follow carefully petrol and gas injectors sequence as shown in the diagram.
- Never connect front and back Solenoid Valve cables to the Ground.
- In order to make a front and back Solenoid Valve right diagnostic, don't connect them to each other.
- Never replace fuses with another ones with bigger amperage.
CAUTION:
Be careful with the cars for which the manufacturer prohibits or advises against disconnecting the battery, not to alter the antitheft devices or automatic adaptivity -
Never use welders connected to the battery of the same car - Connect with suitably insulated soft solderings - Position the BRC electrical devices in a well ventilated
area, protected from water seepages and heat sources - We recommend to insulate the BRC electronic control unit wires which are not connected - BRC reserves the
right to modify this diagram without notice - We also recommend you to be sure to have the last revision of the diagram drawn up by BRC.
M.T.M. Srl
SEQUENT DIRECT INJECTION 2.0
Mazda CX5 Skyactive 2.0 16V 118kW PE EURO 5B GPL
Multipoint Electronic Injection
Changeover
Switch
Cut and
Insulate
Singularly
Gas Pressure
1
2
3
4
and
Temperature
Sensor
Gas
Inlet
Gas Injectors Sequence
Wiring diagram
Diagnostic
Point
Red
3
2
1
Black
Black
Black
Red
Red
+
Cut and
Insulate
Singularly
Pin n° 15 Conn. 60-Way
Pin n° 22 Conn. 60-Way
Pin n° 9 Conn. 60-Way
Pin n° 5 Conn. 140-Way
Pin n° 92 Conn. 140-Way
Pin n° 26 Conn. 140 -Way (1° Injector Signal)
Pin n° 56 Conn. 140 -Way (1° Injector Positive)
Pin n° 28 Conn. 140 -Way (2° Injector Signal)
Pin n° 58 Conn. 140 -Way (2° Injector Positive)
Pin n° 29 Conn. 140 -Way (3° Injector Signal)
Pin n° 59 Conn. 140 -Way (3° Injector Positive)
Pin n° 27 Conn. 140 -Way (4° Injector Signal)
Pin n° 57 Conn. 140 -Way (4° Injector Positive)
Sensor
temperature
water
DO NOT CONNECT
1 2 3 4
4|4
Date:
Diagram n°:
In place of diagran n°:
Draftsman.:
Signature:
Level sensor connector
Cut and Insulate
Rear Solenoid Valve Connector
-
Battery
Warning: CAN BUS connection
can NOT be made on diagnostic
socket level, but it MUST be made
on petrol ECU connector level.
Petrol
ECU
Pin n° 91
Conn. 140 -Way
White (MAP)
Map
sensor
DO NOT CONNECT
MV
Petrol
Injectors
Sequence
02_03_17
//.//.//
I.C.
fusibili
FSG000083R