Descargar Imprimir esta página

American Standard IoT DetectLnk 6072121 Manual Del Propietário página 15

Publicidad

Idiomas disponibles

Idiomas disponibles

14
MAINTENANCE: ADJUST STOP VALVE
IMPORTANT: To avoid overflowing, the STOP VALVE (3) must never be opened to the point where
the flow from the valve exceeds the flow capacity of the fixture.
1. After installation is complete, peel off the PROTECTIVE FILM (1) from the sensor. Standing to one side,
block the sensor with your hand for 10 seconds. Remove your hand and listen for audible "click" from
within the valve.
2. Remove STOP VALVE COVER (2) from STOP VALVE (3). Turn on water supply 1/4 turn to 1/2 turn(CCW)
and test for leaks.
Note: Unit may flush for approximately 3 to 10 sec. when water is first turned on. If flow persists,
turn water off and repeat step #1 above.
3. Actuate the FLUSH VALVE:
A) Cover sensor with hand for 10 seconds.
NOTE: Stand outside of sensor detection area.
B) Remove hand from in front of the sensor; unit will flush in approximately 3 seconds.
C) Press Button in front of the FV for 1-2 Second; Unit will flush in approximately 3 seconds.
4. Adjust STOP VALVE (3) after each flush until the stated flush volume is achieved, no splashing occurs and
the fixture is properly cleansed.
5. When adjustment is complete, replace STOP VALVE COVER (2) and tighten to ensure vandal-resistance.
1
REMOVE COVER
CLOCKWISE CLOSES
STOP VALVE
3
COUNTER-CLOCKWISE
OPENS STOP VALVE
2

Publicidad

loading

Este manual también es adecuado para:

Iot detectlnk 607b121