UNPACKING AND INSPECTION
Pump Components
UNPACKING AND INSPECTION
Pump Components
1
Head Cover Screws (6 total)
2 Power Cord
3 Pump Inlet
4 Mounting Bracket
5 Pump Housing
6 1/4-inch NPT Drain Plug
7 Mounting Bolts (2 total)
8 Air Bleed Plug
9 Pump Outlet
10 Protective Weather Cover
11 Status Display
Unpacking
All Franklin Electric Inline 400 Pressure Boosting Systems are carefully tested, inspected, and packaged to
ensure their arrival in perfect condition.
1.
Inspect exterior of package for shipping damage.
•
If there is damage, notify the shipping agent and your sales representative.
2. Make sure the part number and product ratings on the identification label are correct for the applica-
tion.
What's in the Box
•
Inline 400 Pressure Boosting System
•
Owner's Manual
•
Pressure Tank (if ordered as part of the system)
4
2
3
4
5
11
1
10
9
8
7
6