Descargar Imprimir esta página

GE Zoneline AZ9VH Manual Del Propietario Y Instrucciones De Instalación página 19

Ocultar thumbs Ver también para Zoneline AZ9VH:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing the Zoneline
4. Complete
Condensate
Connections
An external or an internal drain must be attached to
the primary drain connector. A secondary drain is
supplied if required by state and local codes. Refer to
the secondary drain is not used, seal its drain port with
Drain Overview
Secondary Drain
Front or side primary drain options
Internal Drain (Primary)
Run condensate line to
building interior drain
line with proper venting
according to local
building codes.
Option for drain line
connection to front of
platform
49-5000640 Rev. 2
Drain
Option for drain line
connection to right of
platform
4. Complete Condensate Drain
Connections (cont)
External Drain (Secondary)
secondary drain line though
the plenum and grille.
Use a pipe connector and
additional piping to ensure
drain pipe extends past the
outdoor grille.
Drain
Refer to drain platform instruction
manual for drain installation
5. Install Unit to Wall Plenum
Align the unit with plenum opening and slide unit
toward plenum to ensure it is seated properly with the
drain platform. Ensure that unit is secure and level in
all directions.
Wall
Drain
Extend secondary
drain pipe into plenum
or through outdoor
grille. Grille must be
modified to allow drain
line to pass through.
Unit

Publicidad

loading

Este manual también es adecuado para:

Zoneline az9vh12eacZoneline az9vh12ebmZoneline az9vh12dac