Descargar Imprimir esta página

Greencut ATS Serie Manual De Instrucciones página 39

Ocultar thumbs Ver también para ATS Serie:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ATSE AND CONNECTION DIAGRAM TO THE MAIN POWER SUPPLY
Supply
source cable
Set of
Switches
Load
Appliance 1
ATS CONNECTION
STEP 1: Connect the circular hybrid plug cable from the ATS to the generator plug (Connection cable 1).
ATTENTION: When you connect it, please pay attention to the circular hybrid
connector cable terminal direction.
STEP 2: Connect the "generator supply" terminal of the ATS to the generator power output terminal to the current
with the connection cable (Connection cable 2).
STEP 3: Connect the terminal of the ATS power supply to the main power supply with the connection cable (not
included).
STEP 4: Connect the load output terminal to the charging device with the connection cable (not included).
ATTENTION: For a three-phase load terminal, the sequence must be one to one, such as U to U, V
to V, W to W and N to N.
STEP 5: Turn on the electrical circuit of the generator control panel.
STEP 6: Make sure all connections are properly connected, turn on the main power source power supply, push down
the "Control Unit" switch. If the main power supply is good and the indicator light of the power supply and of the
charging device are on, it indicates that the ATS controller is running, it works normally and it is ready to operate.
Load
Load
Appliance 2
Appliance 3
Load
Connects generator
Appliance 4
to the power supply
39
EN
ATS
Signal Terminal

Publicidad

loading

Este manual también es adecuado para:

Ats-14000Ats-14000t