Cabinet
Construction
To eliminate the risk of cabinet burns and
fire, do not have cabinet storage space above the range.
If there is cabinet storage space above range, reduce risk
by installing a range hood that projects horizontally a
minimum of 5" (12.7 cm) beyond the bottom of the
cabinet.
Countertop
Preparation
The cooktop sides of the range fit over tile cutout edge
of your countertop.
If you have a square finish
(flat} countertop,
no
countertop
preparation is required. Cooktop sides lay
directly on edge of countertop.
Formed front-edged
countertops
must have molded
edge shaved flat 3/4" (1.9 cm) from each front corner
of opening (Figure 2).
• Tile countertops
may need trim cut back 3/4"(1.9
cm) from each front corner and/or rounded edge
flattened (Figure 2).
Min.
/
Cutout
(1.9cm)
Provide
an adequate
Gas Supply
When shipped from tile factory, this unit is designed to
operate on 4"(10,!6
cm) water column (I.0 kPa) Natural
gas manifold pressure. A convertible pressure regulator is
connected to the range manifold and MUST be
connected in series with the gas supply line. If LP/
Propane conversion kit has been used, follow instructions
provided with the kit for converting the pressure
regulator to LP/Propane use.
Care must be taken during installation of range not to
obstruct the flow of combustion and ventilation air.
For proper operation, the maximum inlet pressure to the
regulator should be no more than 14"(35,56 cm) of
water column pressure (3.5 kPa). Tile inlet pressure to
the regulator must be at least ! " (.25 kPa) greater than
the regulator manifold pressure setting. Examples: If
regulator is set for natural gas 4"(10,!6
cm) manifold
pressure, inlet pressure must be at least 5"(!2.60
cm); if
regulator has been converted for LP/Propane gas
10"(25,4cm)
manifold pressure, inlet pressure must be
at least 11 "(27,9 cm).
Leak testing of tile appliance shall be conducted
according to the instructions in step 4.
/
/
311/2'_
(81cm)
Formed
or tile countertop
trimmed
¾" (1.9 cm) back at
front
corners
of countertop
(1.9 cm)
opening.
I
Figure 2
• tf the existing
cutout
width
is greater
than
30-1/16"
(76,4 cm}, reduce the 3A" (!.9 cm)
dimension.
Countertop
must be level
Place a level on tile
countertop, first side to side, then front to back. If tile
countertop is not level, the range will not be level. The
oven must be level for satisfactory baking results.
Cooktop sides of range fit over edges of countertop
opening.
2 3/!6"
-_
(5.56 cm}
• For existing
_-
_
cutout width
1
29"/
of 29" (73.7
_73.7
cm)
cm} (Figure 3}:
/
(3.2 cm)
U
The gas supply line should be Y2" or 3A" I.D. (Interior
Diameter)
Seal the openings
Seal any openings in the wall behind the range and in the
floor under tile range after gas supply line is installed.
2 3116"
(5.56 cm)
You must also dear
2 3/16" (5.56 cm) of
material
from
front
of countertop.
.(3.2 cm}
Figure 3
(76.2 cm}
311/2"/
/
(81 cm}
_Formed
or tile countertop
trimmed
lYg' (3.2 cm) back at
front
corners of countertop
opening.