Descargar Imprimir esta página

Friedrich 18K Manual De Instrucciones página 16

Publicidad

Idiomas disponibles

Idiomas disponibles

_ln_s_t_a_ll_a_ti_o_n_in_s_t_ri_u_c_ti_o_ns_.,,/
I
Trial Run
Trial run should be performed after refrigerant piping,drain,wiring,etc. have been finished.
(&CAUTIO~
The air-conditioner is provided with a crankcase heater, check to ensure that the switch on the main
power source has been ON for more than 6 hours ahead of power on preheating, otherwise it might
damage the compressor!
Do not operate the system until all the check points have been cleared.
( A) Check
to
ensure that the stop valves of the outdoor unit are fully opened.
( B ) Check
to
ensure the electric wires has been fully connected.
( C ) Check to ensure that the electrical resistance is more than 2 MO, by measuring the resistance between
ground and lhe terminal of the electrical parts. If not, do not operate the system until the electrical leakage is
found and repaired.
Trial run function identification
Operate remote controller tum ON, then proceed trial run.
Pay attention to the following items while the system is running.
Do not touch any of the parts by hand at lhe discharge gas side, since lhe compressor chamber and the pipes
at the discharge side are heated higher than 194 "F {90°C).
e
Tum off Iha power after trail run is finished.
Installation of the appliance is generally finished after the above operations are done. If you
still
have any trouble,
please contact local technical service center of our company for further information.
-13-

Publicidad

loading

Este manual también es adecuado para:

24k36k42k