Descargar Imprimir esta página

GARDY SHELTER PRIMO 22196 Instrucciones De Instalación página 34

Publicidad

ENGLISH
ATTENTION ! Each purlin is designed to be perfectly aligned with the gables.
Check the inclination of each purlin to ensure correct positioning.
Consolidate the construction with the 4 storm battens (parts S) fastened to the inside of the
front and rear walls with M8x60 bolts. These parts are screwed after having tightened the
side wall planks, as well as the planks and the front and rear gables.
NOTE :
‫ ث‬The hurricane battens should only be screwed against the bottom plank and the first gable
beam at the top;
‫ ث‬M8x60 bolts should not be over-tightened to allow the planks to work.
DOOR INSTALLATION
ITEM
DESCRIPTION
I
Right and left door (semi-glazed)
Place the 2 doors (part I) on the hinges.
I
I
34
I2
I
I
I1
I3
DIMENSIONS (MM)
700 x 1585 mm
I1
QTY
2

Publicidad