4
Slide the gate and linkage into the L ribs on hopper keeping linkage attached to the gate.
5
Insert the "L-shaped" end of the linkage into the gate control on the handle and secure with
the cotter pin provided. Using pliers bend cotter pin to secure linkage to the gate control.
TABLEAU D'APPLICATION DU MATÉRIEL
Taille des particules/matériau
Granulés de chlorure de calcium
Sel gemme
Manuel de l'utilisateur de l'épandeur Chapin -
Réglages de l'épandeur
1-2
3-4
2F
Assemblage Terminé
Français