English
Getting Started
Operation Instructions
5. Once the switches are in the on position
the heating indicator light (#2) and the
cooling indicator light (#3) will turn on (I). It
will take about 15 – 20 minutes for the hot
water to heat to the appropriate temperature.
It will take about 1 hour for the cold water to
cool to the appropriate temperature.
1 hr
Cold
7. To replace the bottle, vertically pull
out the empty bottle with two hands.
Using two hands place the new bottle
of water vertically into the bottle
supporter (#1).
10
6. When the water has reached the
appropriate temperatures for hot and
cold the indicator lights will turn off
and the water is ready for use. The
indicator lights will turn back on
automatically when the machine
needs to reheat or cool again.
15-20
min
Hot