Descargar Imprimir esta página

Fanimation AMPED SHOWROOM Serie Manual Del Usuario página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

How to Assemble Your Ceiling Fan Blades (Continued)
2.
Secure the blade holders to the top hub of the
motor assembly using the 1/4˝-20 screws. (Figure 2)
NOTE: Periodically check blade holder hardware and
resecure if necessary.
WARNING
To reduce the risk of personal injury, do not bend the
blade holders when installing, balancing the blades or
cleaning the fan. Do not insert foreign objects in
between the rotating blades.
CAUTION
To reduce the risk of electric shock, disconnect the
electrical supply circuit to the fan before installing
your light kit.
1.
Remove the three screws in the adaptor plate at
the bottom of the motor assembly. Retain the screws
for Step 3. (Figure 1)
2.
Connect the 2 single pin connectors from the light
kit assembly to the 2 single pin connectors from the
motor assembly. (Figure 2)
CAUTION
The light source is designed for this specific
application and can overheat if serviced by untrained
personnel. If any servicing is required, the product
should be returned to an authorized service facility
for examination or repair.
How to Assemble Your Light Kit
1/4˝-20 Screws
Motor Assembly
Motor Assembly
Light Kit Assembly
13
1/4˝-20 Screws
(2 per assembly)
Blade Holder
Figure 2
HARDWARE USED:
Screws (3)
Figure 1
Figure 2
X 6

Publicidad

loading

Este manual también es adecuado para:

Amped showroom fp7634 serieShowroom serieShowroom amped fp7634 serie