ASSEMBLY INSTRUCTIONS
2. Unscrew the screws (J), and remove the plaster
guard (I).
3. Securing the body assembly:
Fasten the valve body (D) to cross brace with
mounting screws (1, not included).
NOTE: Be sure to position the valve body (D) correctly
in the wall, with the side marked "UP" facing upward.
4. Installing the supply connections:
a. Wrap thread sealant tape around the pipe threads
in a clockwise direction, as shown.
b. Connect the hot and cold water supply lines
(1, not included), the shower (2, not included) and
tub outlet pipes (3, not included) to the valve body
(D). Connect the pipe elbows (4, not included) to
the ends of both pipes, and tighten with a wrench.
See Figure 4a.
c. If you do not wish to install the tub outlet, thread
the plug (G) into the bottom outlet. See Figure 4b.
2
I
3
4a
1
4
J
D
1
4
2
D
3
Copper
or IPS
4