Descargar Imprimir esta página

LF allen + roth 67693W-6104 Instrucciones De Instalación página 8

Ocultar thumbs Ver también para allen + roth 67693W-6104:

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION INSTRUCTIONS
1. Flushing and checking for leaks:
1
Important: After installation is complete, remove
the aerator (1) from the faucet with a coin to flush the
water lines. Turn on the water supply and allow both
hot and cold water to run for at least one minute each.
This flushes away any debris that could cause damage
to internal parts. While the water is running, check for
1
leaks. Turn off the water and replace the aerator.
8

Publicidad

loading