Descargar Imprimir esta página

LD Systems CONTRACTOR Serie Manual De Usuario página 9

Ocultar thumbs Ver también para CONTRACTOR Serie:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32
INSTALLATION
DANGER: Overhead mounting requires extensive experience, including the calculation of the
load limit values of the installation material and regular safety inspection of all installation
materials and devices. If you do not have these qualifications, do not attempt to perform
an installation yourself. Refer instead to a qualified professional. There is a risk that devices
that are incorrectly mounted and secured may come loose and fall down. This can cause
serious injury or death.
Before installation, make sure that the amplifier system to which the speaker is to be
connected is switched off and that the connection cables are de-energised!
Cut a hole with a suitable diameter in the ceiling (CE C6: 170 mm, CE C8: 210 mm).
1
Connect the signal supply to the desired transformer tap (see tables). Fold the speaker's holding
2
arms upwards, press the speaker into the ceiling cut-out and fold the holding arms down again.
CE C6
3 W @ 100 V
white
6 W @ 100 V
red
COM
black
CE C8
5 W @ 100 V
white
10 W @ 100 V
red
COM
black
9

Publicidad

loading

Este manual también es adecuado para:

Contractor ce c6Contractor ce c8Ldcec8Ldcec6