Installation Instructions – IFLD Infrastructure Flood
6.
Support fixture and lower onto pole while feeding
connected supply wires into the tenon opening.
N
ote:
Ensure no wires get pinched between tenon and
slipfitter.
7 .
Once fixture is oriented properly, hand tighten the 8 set
screws to secure fixture with slipfitter in place. Torque
the upper 4 set screws to 25 ft-lbs. Repeat for bottom
4 set screws. Install (8) hex nuts and torque all to 25
ft-lbs.
Figure 17.
Figure 18.
8
Cooper Lighting Solutions
IB506022EN
Installation instructions