Descargar Imprimir esta página

Elkay EZOOTL8WS 1A Manual De Instalacion Y Uso página 15

Estaciones y enfriadores de botellas versátiles operados por sensor

Publicidad

INSTRUCTIONS CONTINUED.....
Refrigerated Cooler side:
Carefully lift and tip the shroud/basin assembly the
cooler frame.
Connect black wires from shroud assembly to
solenoid valve and to the piggyback connector on
solenoid valve; connect red wire to open terminal on
solenoid valve; connect sensor white wire to white
jumper wire connected to power cord.
Disconnect the water line at the solenoid valve.
Reference (Fig. 25, Pg.19) for the operation of the
quick connect fi ttings.
Non-Refrigerated Cooler side:
Carefully tip the shroud/basin assembly toward the cooler
frame.
Connect black wires from shroud assembly to solenoid
valve and to the piggyback connector on solenoid valve;
connect red wire to open terminal on solenoid valve; connect
sensor white wire to white jumper wire connected to power
cord.
Re-connect the water line at the solenoid. Reference (Fig. 25,
Pg.19) for the operation of the quick connect fi ttings.
Precautions need to be taken when
replacing the Basin/shroud assembly:
1) Make sure all wires are inside
frames so as not to become pinched.
2) Water line coming from bottle fi llter
drain must be pulled down as not to
interfere with the fan operation. The
fan blade needs to spin freely.
EZOOTL8WS*1A LZOOTL8WS*1A
Swap drain parts in shroud:
Loosen each hose clamp retaining
the drain pieces.
Remove each drain piece and swap
to other basin.
Tighten each hose clamp.
Fig. 16
Using a #T20 (6 point star bit),
tighten the shroud screws.
Fig. 19
Both sides, both coolers, being
careful not to overtighten.
Page 15
Fig. 17
Fig. 18
INSTALL WRAPPERS &
TRIM STRIPS PER PAGE 11
SEE PAGES 16 & 17 FOR
PLUMBING DIAGRAMS
1000005927 (Rev. E - 08/23)

Publicidad

loading

Este manual también es adecuado para:

Lzoo serieEzoo serieLzootl8ws 1aLzootl8wslk