Descargar Imprimir esta página

LF PROJECT SOURCE 67084W-6104 Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

POP-UP DRAIN INSTRUCTIONS
3. From underneath the sink, screw the bottom gasket
(3) and nut (4) assembly onto the pop-up body (2) by
twisting clockwise until secure.
OPERATION INSTRUCTIONS
1.
Flushing and checking for leaks:
Important: After installation is complete, remove
the aerator (1) with a coin (2) to flush the water lines.
Turn on the water supply and allow both hot and cold
water to run for at least one minute each. This flushes
away any debris that could cause damage to internal
parts. While the water is running, check for leaks.
Turn off the water and replace the aerator.
3
1
1
2
7
2
3
4

Publicidad

loading