EN
3. Important Tips
The solar PV system is grid-tied. Please check if it is allowed in your area. Depending on the region,
√
√
official approval may be required before or after installation.
√
√
√
AIO 2400 should be protected from direct sunlight to prevent rapid temperature increase.
Please check the required accessories before installation, as some accessories need to be
purchased separately.
€
After the installation, please first download the Zendure App to check electricity produced and set
the power to the Microinverter.
After AIO 2400 installation, it will take about 5 minutes before it can be connected to the grid, and
the data will be synchronized to the Zendure App within 20 minutes.
Before setting the output to Microinverter, please confirm the rated power of your Microinverter.
The output to Microinverter should not be greater than the rated power of your Microinverter.
!
Please turn off the device (press and hold the Power Button on AIO 2400 for 2 seconds)before
removing.
4. What's in the Box
AIO 2400
4
AIO 2400 Bracket
Combination Set
support@zendure.com
User Manual
30cm MC4
Output Cable × 4
Wrench for Removing MC4
Connectors