Installation
BAT+
NOTICE:Make sure that the input and output wires and the input and output terminals are connected
tightly.
6) The protective earth ground wire refers to the wire connection between the equipment which
consumes electric equipment and the ground wire. The wire diameter of protective earth
ground wire should be at least as above mentioned for each model and green wire or green
wire with yellow ribbon wire is used.
7)
After having completed the installation, make sure the wiring connection is correct.
8) Please install the output breaker between the output terminal and the load.
9) To connect the load with the UPS, please turn off all the loads first, then perform the
connection and finally turn on the loads one by one.
10) No matter the UPS is connected to the utility power or not, the output of the UPS may have
electricity. The parts inside the unit may still have hazardous voltage after turning off the
UPS. To make the UPS have no output, power off the UPS, and then disconnect the utility
power supply.
11) Suggest charging the batteries for 8 hours before use. After connection, turn the input breaker
in the "ON" position, the UPS will charge the batteries automatically. You can also use the
UPS immediately without charging the batteries first, but the backup time may be less than
the standard value.
12) If it is necessary to connect the inductive load such as a motor or a laser printer to the UPS,
the start-up power should be used for calculating the capacity of the UPS, as its start-up
power consumption is too big when it is started.
2.3 Operating procedure for connecting the long backup time model UPS with the
external battery
1. The nominal DC voltage of external battery pack is 192VDC. Each battery pack consists of
16 pieces of 12V maintenance free batteries in series. To achieve longer backup time, it is
possible to connect multi-battery packs, but the principle of "same voltage, same type"
should be strictly followed.
2. For UPS 6KL/10KL, select the UL1015 10AWG(10mm
12
BAT-
OUT_L
OUT_N
Fig 2- 1: Terminal Block Wiring Diagram
High Performance 6-10k UPS
IN_N
IN_L
PE
2
)/8AWG(16mm
2
) wire or other

Publicidad

loading

Este manual también es adecuado para:

Koban kksai-10000 on