SET UP & USE
Insert 4R (UPPER RIGHT FRONT VERTICAL POLE) into 2R (LOWER RIGHT FRONT
VERTICAL POLE).
Insert 5R (UPPER RIGHT BACK VERTICAL POLE) into 3R (LOWER RIGHT BACK
VERTICAL POLE).
Insert 4L (UPPER LEFT FRONT VERTICAL POLE) into 2L (LOWER LEFT FRONT
VERTICAL POLE).
Insert 5L (UPPER LEFT BACK VERTICAL POLE) into 3L (LOWER LEFT BACK
VERTICAL POLE).
4L
2L
5L
3L
4R
5R
3R
2R
Page 11