INSTALLING AUXILLIARY BATTERY HOLDER KIT - Continued
3. Ensure there are no obstacles
behind the tub wall (FIG. 20-1).
Drill three holes in the tub wall as
shown in FIG. 20-1)
4. Install two grommets (Kit items)
into the two lower holes on tub
wall (FIG. 20-2).
LIFT CORPORATION Sht. 20 of 76 DSG#
3/4" DIA.
1-9/32" DIA.
1-3/4"
2-1/2"
9"
2"
DRILLING HOLES IN THE TUB WALL
FIG. 20-1
GROMMETS
INSTALLING GROMMETS
M-24-01
Rev. - Date: 05/07/24
TUB WALL
TUB WALL
FIG. 20-2