Descargar Imprimir esta página

Friedrich CP08 Manual De Instalación Y Operación página 13

Acondicionador de aire para habitación

Publicidad

Idiomas disponibles

Idiomas disponibles

Suggested Tool Requirements
SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit out from the cabinet by gripping
the base pan handle and pulling forward while
bracing the cabinet.
(Fig .2)
3. Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-PE to
the underside of the window sash.
4.
Insert the Frame guides into the bottom of the
cabinet.
(Fig .4)
5.
Insert the Frame Curtain into the
and Frame Guides.
(Fig .4)
Fasten the curtains to the unit with 8 Type
6.
A screws.
(Fig .4)
(Fig .1)
(Fig .3)
Upper Guide
Upper guide
Screw
(Type A)
1
12
Foam-PE
Frame guide
Shipping screws
Fig. 1
Fig. 2
Fig. 3
Screw(Type A)
1
Fig. 4
9

Publicidad

loading

Este manual también es adecuado para:

Cp06Cp08e10