Descargar Imprimir esta página

Uline H-4018 Instrucciones página 4

Túnel termoencogible
Ocultar thumbs Ver también para H-4018:

Publicidad

Idiomas disponibles

Idiomas disponibles

CAUTION! Assembling the leg kit to the
conveyor can be dangerous. Two people or
a mechanical lift device must be used to
position the conveyor above the leg kit until
they are attached.
SET-UP INSTRUCTIONS
1.
Remove the leg kit from the crate. Inspect for
damage.
2. To adjust leg length, remove shipping bolts from legs
(one bolt per leg). Adjust leg length by measuring
the desired height and subtracting 12" to account
for the conveyor and caster height.
3. Place legs upside down on floor. Position shelf on
legs. Insert socket screws through shelf and each
leg from outside (seven places per leg). Tighten
screws with flat washers, lock washers and nuts. Use
a socket wrench. (See Figure 2)
Outside
PAGE 4 OF 15
OPTIONAL LEG KIT INSTALLATION AND SETUP
Figure 2
4. Screw feet into threaded holes provided on bottom
of the shelf. Insert casters into nylon insert next to
feet. (See Figure 3)
Upside Down View
5. Turn the leg kit right side up. Place conveyor on top
of the leg kit assembly. Insert hex bolts through the
conveyor and leg kit (two bolts per corner). Tighten
bolts with flat washers, lock washers and nuts.
(See Figure 4)
Figure 4
Hex Bolt
Socket Screw
Socket Screw
Hex Bolt
0524 IH-4018
Figure 3

Publicidad

loading