Descargar Imprimir esta página

Druck PACE1000 Instrucciones De Seguridad Y Guía De Instalación página 12

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
3.
Isolate the pneumatic pressures and de-pressurize the pipes (tubes) before connecting or
disconnecting the instrument.
4.
Make sure the user systems can be isolated and vented.
5.
The pneumatic gas must be clean and dry. Refer to specification in the Data Sheet.
6.
Connect the Unit Under Test (UUT) to the appropriate connection port.
2.3 Hydraulic Connection
WARNING
precautions. Use appropriate protective barriers and eye protection.
Before applying pressure, examine all fittings and equipment for damage and
ensure that all equipment is to the correct pressure rating.
Do not exceed the maximum working pressure of the instrument.
Purge all air from the hydraulic liquid.
Do not use a sensor for gas that has been used with hydraulic liquid.
CAUTION
component manual for the unit under test.
Reduce pressure at a controlled rate when venting to atmosphere.
Carefully de-pressurize all pipes (tubes) to atmospheric pressure before
disconnecting and connecting to the unit under test.
Observe absolute cleanliness when using the instrument.
Severe damage can be caused if equipment connected to this instrument is
contaminated.
Connect only clean equipment to the instrument.
To avoid any contamination, an external filter is recommended.
Note: Pressure connections greater than 210 bar (3000 psi) are 9/16-18 UNF male autoclave.
1.
Switch off the power supply before connecting or disconnecting the instrument.
2.
Use the applicable sealing method for all pressure connections. Refer to Section 1.3 on
page 5.
3.
Isolate the hydraulic pressures and de-pressurize the pipes (tubes) before connecting or
disconnecting the instrument.
4.
Make sure the user systems can be isolated and vented.
5.
The hydraulic liquid must be clean, refer to specification given in the Data Sheet.
6.
Connect the Unit Under Test (UUT) to the appropriate connection port.
7.
Fill and bleed the UUT and connecting pipes (tubes).
3. Mounting Kits
There must be enough space at the rear of the instrument for all the cables and pipes. The length
of the cables and pipes must allow for the removal and installation of the instrument. The cooling
air of the instrument must not be obstructed. Allow a free flow of air through the equipment rack
and around the instrument, especially at high ambient temperatures.
3.1 Rack-mount Option
Refer to Figure C1 and the procedure below:
1.
Locate instrument in rack mount assembly (1).
2.
Secure with the four M3 x 6 screws (2) (maximum length M3 x 8).
Copyright 2010 Baker Hughes Company.
6 | PACE1000 Safety Instructions–English
Hydraulic liquid is dangerous. Observe relevant health and safety
Do not exceed the maximum pressures stated in the appropriate

Publicidad

loading