HIAC 9703+ Liquid Particle Counter
Installation
Figure 5 Shipping kit
1. Nut
2. Hex Key, 1.5 mm
3. Syringe, 10 ml
4. Power cord, AC
Installation
WARNING
applicable country safety standard assessment.
CAUTION
described in this document.
Site location
Position the instrument on a dry, level surface. The location must be indoors and near an electrical
outlet and a computer. Make sure the power switch is accessible.
8 / 22
5. Stir Bar, Teflon
6. Probe, large bore
7. Probe, small bore
8. Cable, USB
Electrical shock hazard. Externally connected equipment must have an
Multiple hazards. Only qualified personnel should conduct the tasks
9. Power supply, 24V
10. O-rings
11. Tubing
12. Power cord, European
DOC026.98.80097, Edition 7