Descargar Imprimir esta página

FlowZone FZVAAJ-3 Guia De Funcionamiento página 11

Presion variable de 5 posiciones pulverizador de mochila a bateria
Ocultar thumbs Ver también para FZVAAJ-3:

Publicidad

Idiomas disponibles

Idiomas disponibles

CYCLONE 3
OPERATION GUIDE
FZVAAJ-3
4
If
the
shoulder
straps
arrive detached, attach the
bottom to the adjustable
buckle using the same
method as before.
5
A
B
Slide the top wand holster
onto
protruding
holster
mount on the sprayer tank.
Insert a nut on one side of the
hexagonal slot on the bottom
of the holster and screw
the bolt through the other
side using a Phillip' s head
screwdriver until the bolt
fastens into the nut. Repeat
for the bottom holster/slot.
6
Take the spray gun (10) and
attach it to the threaded
fitting on the end of the hose
(12). Tighten the fitting to
ensure the gasket properly
seals the connection.
- 11 -
© WESSOL, LLC 2022
7
If
spraying
with
the
stainless steel spray wand
(9), pull back on the collar
of the quick-connect fitting
on the spray gun and push
the collar back into its
original position.

Publicidad

loading

Productos relacionados para FlowZone FZVAAJ-3

Este manual también es adecuado para:

Cyclone 3.0Cyclone 3