Descargar Imprimir esta página

FlowZone FZVAAJ-3 Guia De Funcionamiento página 12

Presion variable de 5 posiciones pulverizador de mochila a bateria
Ocultar thumbs Ver también para FZVAAJ-3:

Publicidad

Idiomas disponibles

Idiomas disponibles

CYCLONE 3
OPERATION GUIDE
FZVAAJ-3
SPRAYING
Preparing to spray
1
Although the battery (7)
may be partially charged
upon
delivery,
it
essential to fully charge
the battery prior to the first
operation.
An
indicator
light should flash while the
battery is plugged in and
charging.
The charge level can be
viewed by activating the
indicator lights on the
battery by pressing on the
battery icon.
When using chemicals, always wear protective clothing, including respiratory
protection masks, gloves, eye protection, etc.
- 12 -
© WESSOL, LLC 2022
2
In a separate container,
prepare
the
solution
is
you
want
to
according
to
chemical
manufacturer' s
instructions. Remove the
tank lid and carefully pour
the solution through the
tank
strainer.
Securely
tighten the tank lid.
spray
the

Publicidad

loading

Productos relacionados para FlowZone FZVAAJ-3

Este manual también es adecuado para:

Cyclone 3.0Cyclone 3