Descargar Imprimir esta página

Commissioning, Operation - Festo SPTW-B11R-G14-A-M12 Manual De Instrucciones

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Transport, packaging and storage / 6. Commissioning, operation
5.2 Packaging
Do not remove packaging until just before mounting.
Keep the packaging as it will provide optimum protection during transport (e.g. change in installation site,
sending for repair).
5.3 Storage
Permissible conditions at the place of storage:
Storage temperature: -20 ... +80 °C
Humidity: 45 ... 75 % relative humidity (no condensation)
WARNING!
Before storing the pressure transmitter (following operation), remove any residual media. This is
of particular importance if the medium is hazardous to health, e.g. caustic, toxic, carcinogenic,
radioactive, etc.

6. Commissioning, operation

Required tool: SW 27 open-ended spanner
CAUTION!
Prior to commissioning, the pressure transmitter must be subjected to a visual inspection.
Leaking fluid is indicative of damage.
Only use the pressure transmitter if it is in perfect condition with respect to safety.
6.1 Making the mechanical connection
Only ever screw in, or unscrew, the instrument via the spanner flats and to the prescribed torque using an
appropriate tool. The correct torque depends on the dimensions of the process connection and the sealing
used (form/material). When screwing in or unscrewing the instrument, do not use the case as a working
surface.
When screwing in, do not cross the threads.
Pressure transmitter SPTW
EN
11

Publicidad

loading