Step 4, Secure Wiring; Step 5, Size And Install Ductwork - GE Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para Monogram ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION – VENTED TO THE OUTSIDE
SECURE WIRING
pull a length to reach the hood junction box.
Front Side
Support
Frames
prevent damage during installation and service.
Installation Instructions
Ceiling
Tape
House
Wiring
13
SIZE AND INSTALL DUCTWORK
support frame.
– Add at least 1" for duct overlap at the top.
– Subtract 3/4" for hood insertion into the bottom
of the frame.
" dia. duct to the required length.
NOTE: The bottom end of the duct must be flared
slightly, to facilitate installation of the hood.
house duct. Push duct up until it is 3/4" from the
bottom of the support frame flange.
screws and seal with duct tape.
connection is secured in place.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Monogram zv855

Tabla de contenido