Step 4: Sticking The Box On Top Of The Vehicle; Step 5: Assembling The Cable Gland; Step 6: Installing The Power Cable - STANLine BOX 4G Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
Sticking the Box on top
of the vehicle
Follow the instructions for use of the
assembly product. Stick the Box on
top of the vehicle with the shaped side
towards the front of the vehicle. Keep
the Box in place for 30 min. Wait at least
2 hours before driving.
Assembling the cable gland
Attach the cable gland to the perforated
cover with the flat seal and nut supplied.
Installing the power cable
Pass the supplied power cable through
the cable gland.
STEPS
4
5
6
2H
30 mn
EN
7

Publicidad

Tabla de contenido
loading

Tabla de contenido