Step 7: Preparing The Power Cable; Step 8: Connecting The Faston Connectors; Step 9: Installing The Left Cover - STANLine BOX 4G Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
EN
Preparing the power cable
Remove the power cable insulation
(inside the cover, 1 cm +/- 2 mm) to
connect the Faston connectors.
Connecting the Faston connectors
Connect the Faston connectors to
the 2 pins in the left hole (no mounting
direction).
Installing the left cover
Screw the cover (4 M3 screws and
washers) by adjusting the length of the
cable (inside the hole). Screw the cable
gland onto the cable.
8
STEPS
7
8
9

Publicidad

Tabla de contenido
loading

Tabla de contenido