GF JRG Uni Controller Instrucciones De Montaje página 27

Hycleen automation system
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30
EN
Mounting the powerbox
With cable lengths longer than 300 m,
a powerbox (14) must be connected
14
between two connecting cables.
IN OUT
Note:
When cabling the powerbox, observe the IN and OUT marks. See the installation
instructions for the powerbox.
Note:
Deficient assembly can cause malfunctions!
If the knurled screw is not tightened correctly, the cable plug can work loose over
time. This can lead to a loss of functionality! Make sure that all knurled screws of the
connecting cable are tightened! Never unplug live cables.
Assembling the Uni Controller
To fasten the Uni Controller to a pipe
7
or to pipe isolation, bend the
2 slats (7) slightly along the line.
Position the Uni Controller on the pipe
or the isolation and fasten it using cable ties.
Wall mounting
Drill wall with a 6mm diameter drill
according to the drilling pattern.
Insert dowel,
position the
Uni Controller
and then insert
the screws.
27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9902.000

Tabla de contenido