Jet Swim Motion
Installation in Thick Pool Walls
Thick pool wall with liner
(Masonry block, thermoblock, concrete etc.)
N.B.! Any reinforcement present must not be closer than 50 mm from stainless steel material.
The pool wall must be done being polished before any constituent parts are installed.
1. Make a hole in the pool wall/form and attach the niche, see Figure 1.
The flange on the niche should be in line with the finished pool wall.
2. Connect the start hose to the niche.
3. Attach all socketing pipes in the recess. All threads must be tightened with thread tape.
4. Cast (or else brick up with masonry stones).
5. Attach the self-adhesive gasket onto the niches flange.
6. Install the pool liner with water up to 5 cm under the house.
7. Screw the clamping ring and the rubber gasket in place against the flange of the niche,
5 Nm in torque, the screws must be lubricated.
8. Cut away the pool liner against the inside of the clamping ring.
9. Install the intake grate and the front (these screws must be lubricated).
10. Connect the hose for the air admixture and tighten the hose clamp. Attach the other opening of
the hose 100 mm above the surface of the water, behind the pool wall.
11. Connect the start hose (with a loop at least 150 mm over the surface of the water) to the control box.
12. Connect pipes and valves to the pump. All threads must be tightened with thread tape.
8
18
9
10
11
B
7
6
Concrete pool without liner
Concrete pool with tiles/mosaic: Before assembling in the form, the nozzle (18) and the parts
behind them are removed. A spacer (16) and an extra gasket (15) are added in the order as shown
in the image above when the nozzle is put back in place AFTER moulding (the stud bolts in the
nische are lubricated). The nuts are tightened to 1.5 Nm.
Painted concrete pools: Do not require the above step.
1. Assembly the niche in the form, see Figure 1. The flange on the niche should be in line
with the finished pool wall.
N.B.! Reinforcement present must not be closer than 50 mm from stainless steel material.
2. Connect the start hose to the niche.
3. Attach all socketing pipes in the niche prior to moulding. All threads must be tightened with
thread tape.
4. Mould. When the concrete has burned (and any tiling is completed), install the clamping ring
and the front with intake grates, tighten the screws to a torque of 5 Nm. (these screws must be
lubricated.)
5. Connect the hose for the air admixture and tighten the hose clamp.
Attach the opening of the hose 100 mm above the surface of the water, behind the pool wall.
6. Connect the start hose (with a look at least 150mm over the surface of the water) to the control box.
7. Connect pipes and valves to the pump. Threads are sealed with thread seal tape.
8
4
5
9
10
11
7
6
14
13
15
16
15
13
17
14
2
3
1
12
2
3
1
12
B ( 1 : 8 )
13
ENGLISH
Sample image:
masonry block with liner
1. Niche
2. Socketing pipes, water
3. Socketing pipes, air/start
4. Self-adhesive gasket
5. Gasket
6. Clamping ring
7. Screw
8. Intake grate
9. Screw
10. Front
11. Screw
12. Pool frame (brick)
13. Wall covering
14. Liner
UP
A
Figure 1.2
Niche seen from the front.
Sample image:
concrete without liner
1. Niche
2. Socketing pipes, water
3. Socketing pipes, air/start
4. —
5. —
6. Clamping ring
7. Screw
8. Intake grate
9. Screw
10. Front
11. Screw
12. Pool framework
13. Polish
14. Tile/tile cement
15. Gasket
16. Spacer
17. Parts of the nozzle